Design-build is the most efficient and accountable way to remodel a home, and it’s been the cornerstone of Murray Lampert’s approach since 1975.
In a traditional remodeling arrangement, homeowners deal with separate contracts: one with a designer, another with a general contractor, and often a third with specialty trades. When problems arise — and they always do — responsibility gets passed between parties. Costs shift. Timelines slip. The homeowner ends up in the middle of unwinding a complicated project, which invariably ends up costing a lot of time and money.
Design-build eliminates that structure entirely. Murray Lampert’s in-house architectural designers and interior designers work under the same roof as our production team and project managers. Your project moves from concept to completion under a single contract, with one point of accountability: us. Once your scope is approved, your price is fixed with no change orders driven by miscommunication between parties who weren’t working together from the start.
San Diego’s permitting environment, HOA requirements, and coastal zone regulations add complexity to any remodeling project. A unified design-build team navigates those requirements as a single entity. The articles in this section cover how design-build works, what to look for in a design-build firm, and how to evaluate whether this approach is right for your project.
Design-build is the most efficient and accountable way to remodel a home, and it’s been the cornerstone of Murray Lampert’s approach since 1975.
In a traditional remodeling arrangement, homeowners deal with separate contracts: one with a designer, another with a general contractor, and often a third with specialty trades. When problems arise — and they always do — responsibility gets passed between parties. Costs shift. Timelines slip. The homeowner ends up in the middle of unwinding a complicated project, which invariably ends up costing a lot of time and money.
Design-build eliminates that structure entirely. Murray Lampert’s in-house architectural designers and interior designers work under the same roof as our production team and project managers. Your project moves from concept to completion under a single contract, with one point of accountability: us. Once your scope is approved, your price is fixed with no change orders driven by miscommunication between parties who weren’t working together from the start.
San Diego’s permitting environment, HOA requirements, and coastal zone regulations add complexity to any remodeling project. A unified design-build team navigates those requirements as a single entity. The articles in this section cover how design-build works, what to look for in a design-build firm, and how to evaluate whether this approach is right for your project.