Browsing Posts tagged Room Additions

Murray Lampert Construction

 

I am very pleased at the response and interest of homeowner’s visiting us at the Del Mar Spring Home Decorating & Remodeling Show.  This was the most rewarding show we have done.  We had a past client from 1975 come bye our booth to say high and tell us how they still enjoy the family room my grandfather built.  Another couple from 1989 in South San Diego came by who are ready to remodel their kitchen and bathroom.

http://www.youtube.com/watch?v=awwHSfn9Epo

Now that summer is near, it is obvious people are ready to improve their homes, and now is a great time while our crews are available and cost are still the low.

As always, we provide in home design and accurate quotes with no up front costs.  A new service we offer is fully detailed color 3D renderings and virtual walk through.

We also build custom cabinetry out of 100% wood product.  Our expertly crafted cabinets carry a lifetime warranty on workmanship and finish.

 

 

 

Remodeling Contractor

Individual or firm licensed, bonded and insured to engage in Home Remodeling including Room Additions, Second Stories, Custom Kitchen and Major Renovations.

Sub-Contractor

Individual or firm licensed, bonded and insured to engage in specialty trades i.e. concrete, framing, plumbing, electrical etc.

Home Improvement Agreement

Also know as a contract between a homeowner and licensed contractor.

Scope of Work or Specifications Document

A document that describes the work to be performed including labor, materials and compensation.

Notice of cancellation

Also know as recission notice.  Gives the property owner 3 business days to cancel the home improvement contract after signing. 

Conceptual Plans or Design Drawings

Floor plans, elevations, and sometimes perspectives reflecting the work to be completed.

Working Drawings

Also know as Construction Documents.  Blueprints including structural engineering, Title 24 Energy calculations, framing details, electrical plans that are submitted to the City for permit.

Change Order

Document authorizing change to the contract, plans, specifications.  A change order can increase, decrease or have no affect on the contract price.

For more information, visit www.murraylampert.com

Meet Bill and Jill who are now enjoying their Second Story room and deck.  From design through construction and unltimatly completion, they thought everybody at MLC handled all aspects of the job very well.   They were very pleased, in fact said they plan on calling us back to discuss their next phase in the long range plan, and that is to add a master bedroom on top of existing single story house.   Thank you Bill and Jill for choosing Murray Lampert Construction to improve your home.

Timeliness

Home remodeling can be a major inconvenience if you hire a incompetent contractor.  Finishing on time should be the norm, not a rarity.  To find out a companies reputation for timely completion, you need to speak to past clients. 

Before you sign a remodeling contract make sure the completion time is spelled out and you fully understand it.

When you are ready to remodel, there are 4 very important things to consider. Quality, Value, Timeliness, and Warranty.

My next blog postings will cover each of these important attributes in detail.

Related Posts with Thumbnails