San Diego ADU Contractor

Murray Lampert designs, permits, and builds accessory dwelling units throughout San Diego County, including ground-up detached ADUs, garage conversions, attached ADUs, and junior ADUs. Full service at a fixed price.

  • Family Owned & Operated Since 1975
  • 4 Generations
  • 2026 BBB Torch Award Winner
Detached ADU backyard addition built by Murray Lampert in Encinitas
  • Detached ADU backyard addition built by Murray Lampert in Encinitas
  • ADU living room interior by Murray Lampert in Del Mar
  • Custom ADU kitchen with teal cabinetry built by Murray Lampert in San Diego
Our Specialties

Accessory Dwelling Units in San Diego

Murray Lampert Design, Build, Remodel is a fully licensed San Diego ADU contractor (CA License #458038) handling design, permits, and construction for accessory dwelling units throughout San Diego County. We build detached ADUs, attached ADUs, garage conversions, and junior ADUs (JADUs) under a single design-build contract, with a fixed price before construction begins. ADU projects consistently rank among the most complex residential projects to navigate in San Diego, and our in-house team has the experience to manage every step from site feasibility through certificate of occupancy.

About Us

Treating you like family.

We are Murray Lampert, a family-owned San Diego Design, Build, Remodel company established in 1975. For over 50 years, we have been providing outstanding service to San Diego homeowners. By the time we are done working together, you will feel like family.

Meet The Team
ADU Design-Build

Design and construction under one roof.

ADUs are more complex than they appear. San Diego’s ministerial ADU approval process sounds straightforward, but navigating setbacks, utility connections, Title 24 energy compliance, and fire separation requirements demands experience from day one. When design and construction are handled by separate parties, problems compound: plans go to bid and costs shift, or a constructability issue surfaces mid-build with no one accountable. Murray Lampert’s architectural designers and project managers work under the same roof, designing your ADU to your budget, locking in a fixed price before ground breaks, and managing every permit and inspection through to your certificate of occupancy.

Learn about our design-build process
Gallery

ADU Project Gallery by Murray Lampert

A look at detached ADUs, garage conversions, attached ADUs, and junior ADUs Murray Lampert has built for San Diego County homeowners.

ADU Costs in San Diego

What Does an ADU Cost in San Diego?

ADU costs vary based on type, size, site conditions, and finish level. The ranges below reflect fully permitted, design-built projects with no-change-order pricing, not stripped-down bids that grow once work is underway.

Garage conversion ADU: $175,000 to $225,000 Converting an existing attached or detached garage into a finished ADU. The slab and shell are already in place, which reduces structural cost. Work includes insulation, interior framing, electrical, plumbing, HVAC, drywall, flooring, cabinetry, and fixtures. Garage conversions are the most cost-effective path to a permitted ADU.

Junior ADU (JADU): $225,000 to $275,000 Created within the existing footprint of the primary home. Work includes interior partitioning, an independent entrance, an efficiency kitchen, and all required electrical, plumbing, and energy compliance work. JADUs move through permitting faster than new construction, which helps keep total project cost lower.

Attached ADU: $250,000 to $350,000 An addition to the primary residence with its own entrance and full living amenities. Costs reflect new framing, roofing integration, foundation work, and full interior finish. Complexity increases when plumbing must be extended from a distant location in the existing home.

Detached ADU: $300,000 to $450,000+ A fully independent structure on the same lot. Costs include a new foundation, all utilities extended or separately metered, structural framing, roofing, exterior cladding, windows, and a complete interior finish package. Custom design, elevated finish levels, or challenging site conditions (slope, soil, tight setbacks) drive cost toward the upper end.

What drives cost up: New foundations and utility extensions, elevated finish selections, complex site conditions such as slope or expansive soils, fire separation requirements between the ADU and the primary home, and solar or EV charging installations required by Title 24.

What drives cost down: Garage conversion or JADU (no new foundation), efficient floor plans under 600 square feet, standard finish selections, and straightforward permitting conditions on a flat lot with direct utility access.

We provide a written investment range after the first site visit, before any design work begins. Schedule a consultation to get yours.

Our Process

How a Murray Lampert ADU Project Works

Our design-build process keeps every phase of your ADU project under one roof, from the first site visit to your certificate of occupancy.

1. Site consultation and feasibility. We visit your property to assess zoning, setbacks, utility access, lot coverage, and any site-specific conditions that affect what can be built and at what cost. This first conversation is complimentary and obligation-free.

2. ADU type selection and design development. Our in-house architectural designers develop plans specific to your site and goals: floor plan, structural layout, exterior design, and interior finish selections. You will see detailed drawings and renderings before any permit is submitted.

3. Structural and energy design. Every ADU requires Title 24 energy compliance documentation and, for new construction, a structural engineering review. Murray Lampert coordinates both in-house as part of the design process.

4. Fixed pricing. Once design is complete, we provide a written fixed-price contract. No cost-plus estimates. No allowance-based bids that grow through change orders. The price is the price.

5. Permit preparation and submission. We prepare and submit all permit applications to the City of San Diego Development Services Department or the relevant County jurisdiction. Our team handles plan check responses and revision cycles without involving you in the back-and-forth.

6. Construction and inspections. Your dedicated Project Manager oversees every trade: foundation work, framing, roofing, rough plumbing and electrical, insulation, drywall, exterior finish, cabinetry, and final punch. All inspections are scheduled and managed by our team.

7. Certificate of occupancy and final walkthrough. We walk through every detail with you before the project is complete. The job is done when you say it is done.

Where We Work

ADU Projects Across San Diego County

Murray Lampert designs and builds ADUs throughout San Diego County, including the City of San Diego, unincorporated County parcels, and incorporated cities with their own zoning regulations. ADU rules differ meaningfully by jurisdiction, and our team is familiar with the specific requirements in each area where we work.

We serve homeowners in La Jolla, Del Mar, Encinitas, Solana Beach, Carlsbad, Oceanside, San Marcos, Vista, Escondido, Rancho Santa Fe, Carmel Valley, Scripps Ranch, Mira Mesa, Kearny Mesa, Mission Hills, North Park, South Park, Golden Hill, Normal Heights, University Heights, Mission Valley, Point Loma, Ocean Beach, Lemon Grove, La Mesa, El Cajon, Santee, Chula Vista, Bonita, Eastlake, National City, and surrounding communities.

Why Murray Lampert

Experience the Murray Lampert Difference in ADU Construction

Murray Lampert has built accessory dwelling units across San Diego County for years, earning a reputation for delivering what we promise at the price we quote. Our BBB A+ rating, maintained continuously since 1976, reflects a commitment to honesty, transparency, and quality that spans four generations of the Cantor family.

As a NARI (National Association of the Remodeling Industry) member and multi-year Remodeling Excellence Award winner, Murray Lampert holds itself to the highest professional standards in design, construction, and client communication. Our in-house architectural designers and interior designers are not subcontracted talent: they are full members of your project team, present from the first sketch through the final walkthrough.

Our price-certainty guarantee means that the fixed price in your contract is the price you pay. No change orders. No scope creep. No surprises at the finish line.

Frequently Asked Questions About ADUs in San Diego

What types of ADUs can be built in San Diego?

Murray Lampert builds six types of accessory dwelling units in San Diego: detached ADUs (a fully separate structure, up to 1,200 sq ft), attached ADUs (connected to the primary home, up to 1,200 sq ft), garage conversion ADUs (converting an existing garage into living space), junior ADUs (JADUs, created within the primary home and capped at 500 sq ft), second story ADUs (built above an existing structure such as a detached garage), and two story ADUs (a freestanding two-level detached ADU). The right type depends on your property, budget, and goals. Murray Lampert evaluates all six options during the initial site consultation.

How much does an ADU cost in San Diego?

ADU costs in San Diego range from roughly $175,000 for a garage conversion to $450,000 or more for a custom detached unit with premium finishes. Attached ADUs typically fall between $250,000 and $350,000. Junior ADUs generally range from $225,000 to $275,000. Cost drivers include new foundation requirements, utility extension distance, floor plan complexity, finish level, and site conditions such as slope or tight setbacks. Murray Lampert provides a detailed written investment range after the first site visit, before any design work begins, so you have a realistic number before committing.

How long does the ADU process take from start to finish?

Total project time for most ADU projects in San Diego runs 10 to 18 months from first consultation through certificate of occupancy. Design and engineering typically take 2 to 3 months. City permitting (City of San Diego or the relevant County jurisdiction) adds 3 to 6 months depending on project type and current plan check workloads. Active construction runs 4 to 9 months. Garage conversions and JADUs move faster than ground-up detached ADUs because the structure already exists. Murray Lampert manages the full timeline under one contract and communicates proactively at each phase.

What are the size limits for ADUs in San Diego?

Under current California ADU law (Government Code Section 65852.2) and the City of San Diego's local ordinance, detached ADUs can be up to 1,200 square feet. Attached ADUs are limited to 50% of the primary dwelling's living area, also capped at 1,200 square feet. Junior ADUs are limited to 500 square feet and must be created within the existing primary residence. Setback requirements, height limits, and lot coverage rules vary by zone and jurisdiction. Murray Lampert analyzes each property's specific zoning constraints during the pre-design feasibility phase.

Do ADU projects require permits in San Diego?

Yes. All ADUs in San Diego require a building permit. The process includes plan check review for structural, electrical, mechanical, and plumbing work, plus a series of inspections during construction. California law requires ministerial (non-discretionary) approval for most ADU types that meet code, meaning permits cannot be denied based on neighborhood opposition alone. Murray Lampert prepares and submits all permit applications, manages plan check correspondence, and schedules all required inspections as a standard part of every ADU project.

What is a junior ADU and how is it different from a standard ADU?

A junior ADU (JADU) is a dwelling unit created entirely within the existing footprint of the primary residence, capped at 500 square feet. JADUs require an independent entrance, which can be through an existing exterior door, and must include an efficiency kitchen (a sink and cooking appliance). Unlike a standard attached or detached ADU, a JADU does not require a fully separate utility connection in most cases, and the permitting process is often faster. The tradeoff is size: at 500 square feet maximum, a JADU is better suited for a studio or one-bedroom layout than a full two-bedroom unit.

Will I need to move out during ADU construction?

For most ADU projects, homeowners remain in the primary residence throughout construction. Detached ADUs and garage conversions typically involve no disruption to the main living areas. Attached ADUs may require temporary access to shared walls during framing or utility rough-in, but most homeowners find the work manageable to live around. JADUs created from interior space will involve some disruption within the home. Murray Lampert discusses relocation logistics with every homeowner during pre-construction planning, so there are no surprises once work begins.

What is Title 24 energy compliance and why does it apply to my ADU?

Title 24 is California's Building Energy Efficiency Standards, which apply to new construction and substantial additions or alterations. Every ADU project in San Diego requires a Title 24 compliance report demonstrating that the new unit meets current insulation, lighting, HVAC, and water heating efficiency standards. New detached ADUs and many attached ADUs also require solar-ready wiring or solar installation under current code. Murray Lampert's team handles Title 24 documentation as part of the design process, so you are never left managing energy compliance separately.

What are ADUs typically used for?

Homeowners in San Diego build ADUs for a variety of personal and family purposes. The most common use is multigenerational living: housing aging parents or adult children in a private space on the same property, close to family while maintaining independence. ADUs also serve as dedicated guest accommodations for visiting family and friends, home offices, art or music studios, fitness spaces, and additional living areas for personal use. Murray Lampert works with homeowners to design ADUs that fit their specific lifestyle and integrate naturally with the primary home and property.

How does the design-build process work for an ADU project?

Murray Lampert's ADU process starts with a site visit to assess feasibility and establish a realistic investment range. From there, our in-house architectural designers develop a custom design for the selected ADU type, including floor plan, structural drawings, exterior appearance, and material selections. Once design is finalized and priced, we submit for permits and begin construction. Because design and construction are handled by the same team, there is no gap between what was designed and what gets built, and homeowners have a single point of contact and accountability from first concept through final walkthrough.
Educational Articles

ADU Resources for San Diego Homeowners

Learn more about the ADU design and permitting process in San Diego.

In Law Suites

Granny Flat Remodeling Tips

Granny flats and in-law suites are becoming all the rage in San Diego. We share our top tips for your granny flat remodel in San Diego.

More about granny flats
In Law Suites

Revitalize Your Space: 10 Must-Knows Before Converting Your San Diego Garage

Unlock the potential of your San Diego home with a garage conversion. Explore key considerations before transforming your space. Schedule a consultation today!

More about garage conversions
In Law Suites

10 San Diego ADU Projects Built by Murray Lampert

From detached ground-up builds to garage conversions and above-garage suites, here are 10 real accessory dwelling unit projects Murray Lampert has designed and built for San Diego homeowners.

San Diego ADUs

Ready to start the conversation?

Tell us about your home and what you are hoping to accomplish.